This model is an independent estimate produced by DoBuild Proforma Studio. Premium and fee figures follow CMHC’s published multi-unit schedule effective 2025-07-14, but loan sizing, underwriting value and program eligibility are determined solely by CMHC and the Approved Lender. Lender-side charges are market estimates, not published CMHC figures. Nothing here is a commitment, quote, or approval.

Derived from the breakdown

Target governs · variance n/a
Dwelling dwellings
0
  • Enter a target count or a dwelling breakdown — there is nothing to compute.

Results

Download the completed proforma as a spreadsheet or a report.

PRE-SUBMISSION DRAFT — NOT A CERTIFIED COST REPORT

Export

Total project cost

$0

$0 / unit · $0 / sf

Completed market value

$0

Finished home — no rent roll

Cash required

$0

No debt — 100% equity funded

Year-1 cash-on-cash

0.0%

Net cash flow $0

Report accuracy

Estimate only · 0% verified

0% of total project cost is anticipated (estimated) and 0% is verified (quoted or contracted).

Verified

0% · $0

0 lines

Anticipated

0% · $0

0 lines

App-calculated

0% · $0

Cash investment

Cash-to-cash funding

Total project cost$0
Less: government subsidy / grants-$0
Cash equity required$0
Debt service$0
Year-1 net cash flow$0
Year-1 cash-on-cash return0.0%
As-complete value at cap rate$0

Property

Acquisition & carry

TenureFree & clear
Purchase price$0
Closing fees (lending, brokerage, legal)$0
Cash required at close$0
Property tax during carry$0

Uses of funds

Development budget

AProperty Acquisition & Land

A1 Purchase Price$0
A2 Deed Transfer Tax, Legal & Closing (incl. lawyer's closing fees)$0
A3 Property Mortgage Lending & Brokerage Fees$0
A4 Property Taxes During Hold / Construction$0
A5 Existing Property Mortgage Carry (0 yrs, interest only)$0
Subtotal — A Property Acquisition & Land$0

BConstruction

B1 Hard Construction Cost$0
B2 Change Order Allowance$0
B3 Construction Management Fee$0
B4 CM Fee — Pre-Construction$0
B5 FF&E (amenity & common areas)$0
B6 Utility Service Connections$0
B7 Utilities During Construction$0
Subtotal — B Construction$0

CDesign, Engineering & Soft Costs

C1 Prime Consultants (Arch/Struct/Mech/Elec)$0
C2 Civil Consultant$0
C3 Geotechnical Engineer$0
C4 Environmental Consultant$0
C5 Surveyor$0
C6 Landscape Architect$0
C7 Interior Design$0
C8 Acoustical Consultant$0
C9 Appraisal$0
C10 Testing & Inspections$0
C11 Energy Modelling / MLI Select Scoring$0
C12 Other Consultants & Disbursements$0
Subtotal — C Design, Engineering & Soft Costs$0

DLegal & Administration

D1 Legal Fees (general & closing)$0
D2 Development Management Fee$0
D3 Course of Construction & Liability Insurance$0
D4 Bonding / Security$0
D5 Accounting & Office Administration$0
Subtotal — D Legal & Administration$0

EDevelopment Fees & Permits

E1 Municipal / Application Fees$0
E2 Development Charges$0
E3 Building Permits$0
E4 Demolition Permits$0
E5 Cash-in-lieu of Parkland$0
Subtotal — E Development Fees & Permits$0

FMarketing & Leasing

F1 Marketing (renderings, web, signage)$0
F2 Advertising$0
Subtotal — F Marketing & Leasing$0

GOperating to Stabilization

G1 Operating Costs to Stabilization (0-month lease-up, computed)$0
Subtotal — G Operating to Stabilization$0

HFinancing Costs — cash investment (no debt)

H1 No lender or insurance costs — project funded with cash$0
Subtotal — H Financing Costs — cash investment (no debt)$0

IContingencies & Escalation

I1 Hard Cost Contingency (on hard construction)$0
I2 Escalation Allowance (on hard construction)$0
I3 Soft Cost Contingency$0
Subtotal — I Contingencies & Escalation$0

JGovernment Taxes

J1 HST at Completion (self-assessed)$0
Subtotal — J Government Taxes$0
Total project cost$0

Hard cost / sf

$0.00

Soft cost / sf

$0.00

Cost / sf GFA

$0.00

Cost / unit

$0

Contingency & escalation added by the app: $0.

Capitalization

Equity remainder & returns

Total project cost (incl. premium)$0
CMHC insured loan funded-$0
Potential government subsidy-$0
Equity remainder$0
Equity remainder as % of TPC0.0%
Investor equity retained$0
Sponsor equity retained$0
Investor cash invested$0
Year 1 investor distribution$0
Year 1 ROI on equity retained0.0%
Year 1 ROI on cash invested0.0%
Total 5-year distributions$0
5-year distribution multiple0.00×
Average yearly ROI on equity retained0.0%

0 units · 0 sf GFA · gross potential revenue $0 per year.