This model is an independent estimate produced by DoBuild Proforma Studio. Premium and fee figures follow CMHC’s published multi-unit schedule effective 2025-07-14, but loan sizing, underwriting value and program eligibility are determined solely by CMHC and the Approved Lender. Lender-side charges are market estimates, not published CMHC figures. Nothing here is a commitment, quote, or approval.

Detailed version

Untitled project

Purpose-built rental

Location not set

Derived from the breakdown

Target governs · variance n/a
Dwelling suites
0
  • Enter a target count or a suite breakdown — there is nothing to compute.

Results

Download the completed proforma as a spreadsheet or a report.

PRE-SUBMISSION DRAFT — NOT A CERTIFIED COST REPORT

Export

Total project cost

$0

$0 / unit · $0 / sf

Stabilized NOI (Yr 1)

$0

EGI $0

Max conventional loan

$0

Binding: Loan-to-Cost / Loan-to-Value / DCR (tied)

Stabilized DCR

0.00

Below minimum DCR

Report accuracy

Estimate only · 0% verified

0% of total project cost is anticipated (estimated) and 0% is verified (quoted or contracted).

Verified

0% · $0

0 lines

Anticipated

0% · $0

0 lines

App-calculated

0% · $0

Advancing

Construction advancing & equity required

Total funded loan$0
Advance cap during construction (no holdback)75%
Advanced during construction$0
Rental achievement holdback$0
Peak equity required (before holdback release)$0
Equity remaining after stabilization$0
Equity required before first advance$0

Loan sizing

Lesser of three lender tests

Eligible cost basis (excl. financing fees & premium)$0
1 · Loan-to-Cost test$0
As-complete lending value (NOI ÷ cap rate)$0
2 · Loan-to-Value test$0
Annual mortgage constant4.0000%
Contract rate0.00%
Qualifying rate (higher of contract & market)0.00%
Qualifying mortgage constant4.0000%
3 · DCR test (at qualifying rate)$0
Maximum base loan — Loan-to-Cost / Loan-to-Value / DCR (tied)$0
Total funded loan$0
Annual debt service$0
DCR at contract rate0.00×
DCR at qualifying rate0.00×
Replacement reserve (deducted from NOI)$0
Underwriting NOI (after reserve)$0
Monthly payment$0
Repayment basisAmortizing
Balance at end of 5-year term$0
Effective loan-to-cost0.0%

Valuation

Anticipated terminal value (cap rate)

BasisNOI ÷ cap rate
Selected cap rate5.5%
Project terminal value$0
Zoning in placeNo
Permit statusNot started

Property

Acquisition & carry

TenureFree & clear
Purchase price$0
Closing fees (lending, brokerage, legal)$0
Cash required at close$0
Property tax during carry$0

Uses of funds

Development budget

AProperty Acquisition & Land

A1 Purchase Price$0
A2 Deed Transfer Tax, Legal & Closing (incl. lawyer's closing fees)$0
A3 Property Mortgage Lending & Brokerage Fees$0
A4 Property Taxes During Hold / Construction$0
A5 Existing Property Mortgage Carry (0 yrs, interest only)$0
Subtotal — A Property Acquisition & Land$0

BConstruction

B1 Hard Construction Cost$0
B2 Change Order Allowance$0
B3 Construction Management Fee$0
B4 CM Fee — Pre-Construction$0
B5 FF&E (amenity & common areas)$0
B6 Utility Service Connections$0
B7 Utilities During Construction$0
Subtotal — B Construction$0

CDesign, Engineering & Soft Costs

C1 Prime Consultants (Arch/Struct/Mech/Elec)$0
C2 Civil Consultant$0
C3 Geotechnical Engineer$0
C4 Environmental Consultant$0
C5 Surveyor$0
C6 Landscape Architect$0
C7 Interior Design$0
C8 Acoustical Consultant$0
C9 Appraisal$0
C10 Testing & Inspections$0
C11 Energy Modelling / MLI Select Scoring$0
C12 Other Consultants & Disbursements$0
Subtotal — C Design, Engineering & Soft Costs$0

DLegal & Administration

D1 Legal Fees (general & closing)$0
D2 Development Management Fee$0
D3 Course of Construction & Liability Insurance$0
D4 Bonding / Security$0
D5 Accounting & Office Administration$0
Subtotal — D Legal & Administration$0

EDevelopment Fees & Permits

E1 Municipal / Application Fees$0
E2 Development Charges$0
E3 Building Permits$0
E4 Demolition Permits$0
E5 Cash-in-lieu of Parkland$0
Subtotal — E Development Fees & Permits$0

FMarketing & Leasing

F1 Marketing (renderings, web, signage)$0
F2 Advertising$0
Subtotal — F Marketing & Leasing$0

GOperating to Stabilization

G1 Operating Costs to Stabilization (12-month lease-up, computed)$0
Subtotal — G Operating to Stabilization$0

HConventional Construction Loan Costs

H1 Lender / Commitment Fee$0
H2 Mortgage Brokerage Fee$0
H3 Standby Fee on Undrawn Funds (computed)$0
H4 Draw / Administrative Fees$0
H5 Lender's Legal Fees$0
H6 Appraisal$0
H7 Discharge Fee$0
H8 Interest During Construction (18 months, computed)$0
H9 QS / Cost Consultant (draw monitoring)$0
Subtotal — H Conventional Construction Loan Costs$0

IContingencies & Escalation

I1 Hard Cost Contingency (on hard construction)$0
I2 Escalation Allowance (on hard construction)$0
I3 Soft Cost Contingency$0
Subtotal — I Contingencies & Escalation$0

JGovernment Taxes

J1 HST at Completion (self-assessed)$0
Subtotal — J Government Taxes$0
Total project cost$0

Hard cost / sf

$0.00

Soft cost / sf

$0.00

Cost / sf GFA

$0.00

Cost / unit

$0

Contingency & escalation added by the app: $0.

Operations

5-year net income projection

($)Year 1Year 2Year 3Year 4Year 5
Gross potential revenue$0$0$0$0$0
Less: vacancy & bad debt-$0-$0-$0-$0-$0
Effective gross income$0$0$0$0$0
Less: operating expenses-$0-$0-$0-$0-$0
Net operating income$0$0$0$0$0
Less: debt service-$0-$0-$0-$0-$0
Net cash flow$0$0$0$0$0
DCR0.000.000.000.000.00
Cumulative cash flow$0$0$0$0$0

Capitalization

Equity remainder & returns

Total project cost (incl. premium)$0
CMHC insured loan funded-$0
Potential government subsidy-$0
Equity remainder$0
Equity remainder as % of TPC0.0%
Investor equity retained$0
Sponsor equity retained$0
Investor cash invested$0
Year 1 investor distribution$0
Year 1 ROI on equity retained0.0%
Year 1 ROI on cash invested0.0%
Total 5-year distributions$0
5-year distribution multiple0.00×
Average yearly ROI on equity retained0.0%

0 units · 0 sf GFA · gross potential revenue $0 per year.